Product Thermal Capacity: 1 - 20 t/h
Working Pressure: 0.7 - 2 Mpa
Available Fuel: Nature gas, coke oven gas, biogas, methanol, liquid propane gas, diesel, heavy oil, light oil, crude oil, etc.
Available Industries: Heat supplying, chemical, food, textile, printing and dyeing, cigarettes and tobacco, fodder, pharmacy, building materials, brewery, rubber, hospital etc.
WNS series horizontal internal combustion boiler is a boiler shell type 3 passes wetback oil/gas fired boiler. After fuel is being atomized by burner, flame is full of the wave furnace and transfer heat via furnace wall, this is 1st pass; the high temperature smoke is collected in reversal chamber and then enters 2nd pass which is grooved tubes bundle area; after heat convection, air temperature gradually falls and goes to front smoke box and turn to 3rd pass, which is smooth tubes bundle area, and then enters chimney passing back smoke box and exhausted to the atmosphere.
1. Digitized manufacture
The key part such as material cutting, rolling, drilling are proceeded by advanced CNC machining process to reduce the assemble stress and extend boiler working lifetime.
The front and back smoke chamber plates are cut by CNC plasma cutting machine and looks tidy and beautiful.
2.Easy operation and maintenance
Fully automatically operating, with automatically adjustment and protection of burning, water level, temperature and steam pressure.
3. Longer working life
Smoke tube and tube sheet connection is expanded first to eliminate the gap between them, then adopt automatic argon arc welding to relief the stress and expand boilers working life.
Longitudinal and girth joint adopt advanced automatic submerged-arc welding for good welding quality. All longitudinal and girth joint will have 100% radiographic inspection.
Fin tube us ND steel or stainless-steel material which avoid low temperature corrosion.
Inspection procedure point is set up to guarantee the sequence of expanding and welding, avoid cracking of the tube sheet holes.
4. Less fuel consumption
High quality aluminum silicate fiber is used with fire clay insulation, to control the boiler body temperature below 45℃ to control heat lost.
Sufficient steam storage room and heating area makes boiler to generate high quality steam and high thermal power.
Condenser is added to reuse the waste heat of the exhausted smoke to increase feeding water’s temperature and reduce emission temperature, which can increase the thermal efficiency above 98% and save operating cost.
Mar 21, 2016· Tanjung Bin Energy Achieves Commercial Operations. 1000MW Power Plant’s construction & commissioning completed within stipulated timeframe. Kuala Lumpur, March 21, 2016 – Malakoff Corporation Berhad’s (Malakoff) 1,000 Megawatt (MW) Tanjung Bin Energy (TBE) power plant, also commonly known as T4, enters into its commercial operations on 21st March 2016, following its …
The 1 st and 2 nd units of Tanjung Bin Power Plant have successfully gone into commercial operation. With the 1 st Unit completed 16 days ahead of the contractual schedule. This paper covers a brief history of thermal power plants in Malaysia and the technical features of Tanjung Bin Power Plant.
The largest of these is the 3 x 700 MW Tanjung Bin Power Station in the state of Johor, in the south west of the Malaysian peninsula. Zelan joined force as the with Sumitomo for the development of 2,100 megawatt coal-fired power plant in southern Johor state to …
Malakoff Corp.’s brand new 1-GW Tanjung Bin Energy Power Plant (T4) is an ultrasupercritical coal-fired power plant located next to Malakoff’s existing 2.1-GW coal-fired Tanjung Bin Power Plant.
Tanjung Bin Power Plant, Malaysia Malaysia experiences increased electrical power consumption and to meet the needs several large power stations have been developed. Tanjung Bin 3x700 MW Power Station is Malaysia’s first coal-fired power station and the first unit thereof was taken into operation in 2006. Protecting heat exchangers
The coal power plant boiler in Senegal will be constructed on a total land area of 29 hectares, near the village of Minam, and a few villas and a small fishing wharf. The plant installations will be located on a site at a minimum distance of 500m from dwellings, buildings usually occupied by persons unrelated to the project, public buildings and areas designated for residential development.
1. Coal Fired Power Plant – Basics 2. Origin and Properties of Coal 3. Influence of Coal Properties on Boiler Operation 4. Effect of Steam Cycle Conditions on Efficiency 5. Problems that can be Caused by Coal in Boilers 6. Examples of Power Plant Problems Caused by Coal
5 | Biomass and Waste co-firing in coal power plants - Dr. D. Seibt Biomass – at Vattenfall • has a long history of working with biomass in producing heat and electricity and plans to increase co-firing of biomass in coal power plants to reduce fossil emissions of …
A Phase-1 2X (300-400MW) coal-fired power plant units are built up there for relieving the power supply demand in this island. The project, which includes 2 sets of coal fired power generation units with 300MW to 400MW capacity for each and the related auxiliaries, is located in the village TAHARAN of east Rembang city, central Jawa, Indonesia.
Apr 11, 2016· Tanjung Bin Energy (TBE) power plant, also known as T4, is a new super critical coal-fired power plant developed by Tanjung Bin Energy Issuer, a part of Malakoff Corporation. The project is located at the southern tip of the West Malaysian Peninsula.
Malakoff Corporation Berhad, a subsidiary of MMC Corporation Berhad, is an independent Water and Power Producer (IWPP) with core focus on power generation, water desalination and operations & maintenance services.
No. 76, Xin Da Road, Zhou tie Town, Yixing, Wuxi, China
0086-510-68530066, +86-13506151292
Get Latest PriceCopyright © 2020.Zhongzheng Boiler Co., ltd. All rights reserved.