Introduction of WNS gas / oil fired steam boiler:

WNS series horizontal internal combustion boiler is a boiler shell type 3 passes wetback oil/gas fired boiler. After fuel is being atomized by burner, flame is full of the wave furnace and transfer heat via furnace wall, this is 1st pass; the high temperature smoke is collected in reversal chamber and then enters 2nd pass which is grooved tubes bundle area; after heat convection, air temperature gradually falls and goes to front smoke box and turn to 3rd pass, which is smooth tubes bundle area, and then enters chimney passing back smoke box and exhausted to the atmosphere.

Technical advantages:

1. Digitized manufacture
The key part such as material cutting, rolling, drilling are proceeded by advanced CNC machining process to reduce the assemble stress and extend boiler working lifetime.
The front and back smoke chamber plates are cut by CNC plasma cutting machine and looks tidy and beautiful.

2.Easy operation and maintenance
Fully automatically operating, with automatically adjustment and protection of burning, water level, temperature and steam pressure.

3. Longer working life
Smoke tube and tube sheet connection is expanded first to eliminate the gap between them, then adopt automatic argon arc welding to relief the stress and expand boilers working life.
Longitudinal and girth joint adopt advanced automatic submerged-arc welding for good welding quality. All longitudinal and girth joint will have 100% radiographic inspection.
Fin tube us ND steel or stainless-steel material which avoid low temperature corrosion.
Inspection procedure point is set up to guarantee the sequence of expanding and welding, avoid cracking of the tube sheet holes.

4. Less fuel consumption
High quality aluminum silicate fiber is used with fire clay insulation, to control the boiler body temperature below 45℃ to control heat lost.
Sufficient steam storage room and heating area makes boiler to generate high quality steam and high thermal power.
Condenser is added to reuse the waste heat of the exhausted smoke to increase feeding water’s temperature and reduce emission temperature, which can increase the thermal efficiency above 98% and save operating cost.

Precautions to take before caring out Boiler operatio

A marine boiler is a closed vessel in which water is heated, steam is generated, steam is super heated, or any combination thereof, under pressure or vacuum, for use external to itself, by the direct application of energy from the combustion of fuels, from electricity or nuclear energy. Precautions while Starting Boiler

Basic precautions before re-starting Boiler - Boiler a

File Size: 41KB Oct 19, 2005· Basic precautions before re-starting Boiler Basic precautions before re-starting Boiler explosion was a consequence of wet bagasse into the furnace.Repairs were undertaken and the we started firing back the boiler yesterday at noon and full steam pressure was achieved at 5.00 pm and the Mills back in operation at 6.00 pm. (more volume

OBSERVING BOILER SAFETY RULES - idc-online.c

OBSERVING BOILER SAFETY RULES ALWAYS watch the steam gauge closely and be prepared to cut the boiler in, opening the Ø Pre-operational checks should be completed before lighting-up any boiler. Ø Necessary to ensure the boiler plant is in a safe and efficient condition.

Boiler Preparation, Start-Up and Shutdo

Describe the basic preparation of a boiler for start-up, and the start-up and shutdown procedures. Learning Objectives Here is what you will be able to do when you complete each objective: 1. Describe the steps that must be taken to prepare a boiler for start …

Starting and Stopping Boiler - Marine Engineeri

Precautions on Starting Boiler. Before start-up of the boiler plant, following general work and check procedures must be considered. Check that the main steam valve, by-pass valve and circulation valves if provided, scum valve, and blow-down valves are closed. Open the feed water valves and the air valve.

Instruction, Operation, and Maintenance Manual Boile

File Size: 1MB Instruction, Operation, and Maintenance Manual Fulton Gas Fired Steam Boilers HP to 60 HP Serial Number: _____ Boiler/Steam Pac Water Horizontal Boiler/Steam Feedwater Vertical Boiler/Steam Horizontal before starting work. CAUTION Do not clean …

precautions taken before starting up a steam boil

Buderus coal fired steam boiler cost Bangladesh . Horizontal Steam Boilers. Recent Posts. precautions taken before starting up a steam boiler; boiler companies in maharashtra; boiler attendant gauteng pronvince; 2 ton coal fired boiler; low price gas boiler;

class iv preparation: sample boiler questions. very goo

Dec 22, 2011· Are there any special precautions required before starting a gas burning boiler? 2. How do you bring a newly-started boiler on line? there any precautions to be taken when bringing a superheater on line? 17. What causes boiler tubes and other boiler heating surfaces to overheat or fail? sample boiler questions. very good.

Pre Checks Before Starting A Steam Boiler - CDS Rewin

precautions taken before starting up a steam boiler. caution before starting of water tube boiler. precautions taken before starting up a steam boiler. Starting and Stopping Boiler Marine Engineering Precautions on Starting Boiler. Before start-up of the boiler plant, following general work and check procedures must be considered. Get a Quote

Section 2 START-UP AND OPERATION STEAM BOILE

The steam pressure in the boiler is regulated by the Boiler Operator. This is a pressure control which senses the steam pressure and turns the boiler on and off accordingly. This control must be operationally tested. Adjust the pressure setting on the control to a pressure less than the boiler pressure (as shown on the boiler pressure gauge).

Steam turbines start-ups - imp.gda.

Simultaneously, gland steam system is started to prevent air in-leakage. Gland steam must have appropriate temperature and pressure which must be controlled during start-up. Prior to supplying steam to the turbine, the steam supply pipelines have to be drained and heated up. In case of turbines with cooling water preheating and low-pressure (LP

Contact Us

zhulin@zozen.com

No. 76, Xin Da Road, Zhou tie Town, Yixing, Wuxi, China

0086-510-68530066, +86-13506151292

Get Latest Price
Get in Touch

If you have any problems about our product and service,please feel free to give your inquiry in the form below. We will reply you within 24 hours as soon as possible.Thank you!

  • Boiler type
  • Name
  • email
  • Phone or Whatsapp
  • message
I accept the Data Protection Declaration

Copyright © 2020.Zhongzheng Boiler Co., ltd. All rights reserved.

top