Product Thermal Capacity: 1 - 20 t/h
Working Pressure: 0.7 - 2 Mpa
Available Fuel: Nature gas, coke oven gas, biogas, methanol, liquid propane gas, diesel, heavy oil, light oil, crude oil, etc.
Available Industries: Heat supplying, chemical, food, textile, printing and dyeing, cigarettes and tobacco, fodder, pharmacy, building materials, brewery, rubber, hospital etc.
WNS series horizontal internal combustion boiler is a boiler shell type 3 passes wetback oil/gas fired boiler. After fuel is being atomized by burner, flame is full of the wave furnace and transfer heat via furnace wall, this is 1st pass; the high temperature smoke is collected in reversal chamber and then enters 2nd pass which is grooved tubes bundle area; after heat convection, air temperature gradually falls and goes to front smoke box and turn to 3rd pass, which is smooth tubes bundle area, and then enters chimney passing back smoke box and exhausted to the atmosphere.
1. Digitized manufacture
The key part such as material cutting, rolling, drilling are proceeded by advanced CNC machining process to reduce the assemble stress and extend boiler working lifetime.
The front and back smoke chamber plates are cut by CNC plasma cutting machine and looks tidy and beautiful.
2.Easy operation and maintenance
Fully automatically operating, with automatically adjustment and protection of burning, water level, temperature and steam pressure.
3. Longer working life
Smoke tube and tube sheet connection is expanded first to eliminate the gap between them, then adopt automatic argon arc welding to relief the stress and expand boilers working life.
Longitudinal and girth joint adopt advanced automatic submerged-arc welding for good welding quality. All longitudinal and girth joint will have 100% radiographic inspection.
Fin tube us ND steel or stainless-steel material which avoid low temperature corrosion.
Inspection procedure point is set up to guarantee the sequence of expanding and welding, avoid cracking of the tube sheet holes.
4. Less fuel consumption
High quality aluminum silicate fiber is used with fire clay insulation, to control the boiler body temperature below 45℃ to control heat lost.
Sufficient steam storage room and heating area makes boiler to generate high quality steam and high thermal power.
Condenser is added to reuse the waste heat of the exhausted smoke to increase feeding water’s temperature and reduce emission temperature, which can increase the thermal efficiency above 98% and save operating cost.
Boiler installation costs can be expensive and quotes can vary wildly, with a typical boiler installation costing anywhere between £3,000 and £5,000, so be sure to shop around. They depend on whether it’s a basic like-for-like switch to a newer model, or a complete system change, with Powerflushes and additional pipework.
Our Plumbing CAD Details package can help broaden the foundation from which you assemble your design drawings, and give you the edge that will set you apart from your competitors. Single Wall Hung Water Closet Detail. Typical Bracket And Grinnel Ct-130r Support Detail For Water Closet And Urinal Flush Valves Boiler With Domestic Hot
Guide to water heater or geyser installation: Water heater piping installation & connections: here we describe the plumbing connections and piping options for hot water system hook-ups. We explain the piping for a basic water heater installation compared with options for connecting hot water heaters in parallel, in series, or ganged.
front of boiler long axis of boiler notes: 1. boilers shall be designed to withstand the forces and moments shown above. 2. add any fy force (500 lb [230 kg] minimum) as an estimation of the weight effect of the steam lead and valve on the boiler. boiler and pipe hanger suppliers shall coordinate to determine the exact fy force which will be
water storage tank or indirect water heater is located at an elevation above the fixture outlets in the system a vacuum relief valve shall be installed on the storage tank. combination temperature and pressure relief valve-----~ drain--·~i hotwater supply r---cold water ~-vacuumrelief valve ~. gate valve, typical "'----union, typical
Crown Boiler Shadow - 112k BTU - 94% AFUE - Hot Water Gas Boiler - Direct Vent - 4,500 to 10,200 ft. Altitude Model: SHADW120HNZ10U Wall Mounted, Condensing Boiler with Modulating Gas Valve.
Standard Details. Details associated with the Divisional CSI standards. Hot Water Unit Heater Piping Diagram. In-Line Circulator Piping. Manometer Piping and DPT Mounting Detail. Typical Trench Detail Chilled Water Piping. Upblast Exhaust Fan and Curb Detail.
23 21 00 - 02 Heating Hot Water System Piping Schematic .DWG / .PDF. 23 21 00 - 03 Terminal Heating Unit Hydronic Coil Piping Schematic .DWG / .PDF. 23 21 00 - 04 Cooling Coil Condensate Trap .DWG / .PDF. 23 21 00 - 05 Small Coil Piping Detail .DWG / .PDF. 23 21 02 - 01 Pumped Pre Heat Water Coil Piping Schematic .DWG / .PDF
typical piping for conventional single boiler installation lb-500, lb-750, lb-1000 • safety relief valve setting should not exceed pressure rating of any component in the system. • piping should conform to local codes. • ball valves are shown for service. however local codes shall govern their usage. • pipe relief valve to open drain.
LANL Standard Drawings and Details either (1) depict required format/content or (2) are templates that are completed by a Design Agency (LANL or external AE) for a design drawing package, in a manner similar to specifications.
Typical Water-Cooled Chiller Piping Detail Water-Cooled Chiller Drain Flange (Typical) Valve Pressure Gauge (Typical) Strainer (if pump is on return side of chiller) Drain Valve Supply Return Thermometer (Typical) Condenser Water Chilled Shutoff Valves Section 6 – …
No. 76, Xin Da Road, Zhou tie Town, Yixing, Wuxi, China
0086-510-68530066, +86-13506151292
Get Latest PriceCopyright © 2020.Zhongzheng Boiler Co., ltd. All rights reserved.